The tool's example fleet, by hand
The default inputs are 4 drones, 50 cargo each, 10 cash per ore, and a 30-second cycle. They are illustration values for the arithmetic — not reported game data, so replace them with your own session before drawing conclusions.
- • Fleet load value: 4 × 50 × 10 = 2,000 cash per cycle
- • Cycle rate: 3600 ÷ 30 = 120 cycles per hour
- • Active income: 2,000 × 120 = 240,000 cash per hour
- • Offline, 8 hours at 100%: 240,000 × 8 = 1,920,000 cash
- • If your overnight test collects only 60% of that, enter 60 as efficiency and the estimate matches reality.