One fleet, diagnosed
Say a timed cycle runs 40 seconds and the return flight alone takes 18 — travel owns 45 percent of the loop. Speed is the matched track. If the next speed level cuts the cycle to 34 seconds, cycles per hour rise from 90 to about 106 (a 17 percent income lift at the same load value), which almost certainly beats the mining-power alternative that round.
The numbers in that example are illustration, not game data — the method is the content. Run it with your own seconds in the income calculator and let the ratio pick the track.